A comment
Do not listen to any ill-wishers. The house is really good. Costed about 2.5 million. Attic. With a foundation (concrete pile-grouted 7x10), With a roof (velvet metal tile), with insulation (ecowool, 130 mm of the wall, 200 mm of the floor, floor, roof). All internal walls are also capital and insulated. If you make the walls single-layer, then perhaps it will turn out not very smooth and there will be no sound insulation. So it’s better not to save. This I indicated the price without windows and doors, without electrics and plumbing. When I installed all this, with floors (grooved board) and heating (Zebra infrared ceiling), and with exterior painting (Tikkurila covering), it turned out about 3 million rubles. I can’t even say if it’s expensive or not. Some gasp, they say expensive, - Others ask incredulously, - they say something is too cheap. In general, how many people, so many opinions. And so at all for the price of two in the city. 2016 prices.
The house keeps warm. Once, once a day, with the heating turned off, only six degrees the temperature dropped (I hung thermometers in each room to control the heating). But all the same, gradually, one at a time, I warm the windows and doors. All the same, electricity consumption is too big for me. 1200 - 1300 kW per month. And in the cold months (-25 -30 degrees) up to 1800 kW reels. Well, something like that, the Plan installers promised. Interestingly, on the second floor, the plan practically does not turn on. There is enough heat from below. Goes up the stairs. Now about the slots. As soon as the heating was turned on, a gap appeared on the inner walls above the doorways around the circumference. Worried, ran to the company that was building. He showed photos, shouted. Neighing What's so funny, I ask.
They got their pictures, those houses that they built for themselves. And there they have the same story. They explained that the internal walls dry faster when the heating is turned on than the external ones. In the summer, they say everything will fall into place. And so it happened. Although they advertise that the tree is dry, it still shrinks.When you check it with the device, the humidity is normal, but in the depths of the tree, humidity is still preserved. And then she comes out. Something like that. So there is no completely dry tree. Is that a stool from the IKEA store. There the tree is definitely dry. And I have stood the whole house with open windows all summer. I thought it would dry, and still not completely dry.
The company was building. From the foundation to the roof. I recommend contacting only those companies that have been building such houses for at least five years. What would people with experience be. Boards themselves from the factory where glued beams are made. The material is the same. In general, build and fear nothing. Go on an excursion to those houses that are being built, look, jump, touch. Ask those who have been living for several years. They will only praise. And living in this house is a pleasure.
pros
Breathable house, no films, polystyrene, glue. I don’t want to be in the city anymore, I’ve been pulling to the country all the time.
Minuses
In my opinion, in comparison with timber and log houses there are no minuses