A comment
Almost, because you cannot pull such blocks yourself, but at each stage I took an active part. The installation took place from September 1 to October 15 and turned out to be more expensive than I expected, mainly due to the high rental of construction equipment. An hour of truck operation cost 20 y. e., and the crane’s hour is 30. e. In total, 5 walkers were made in a day, and renting only those of one equipment cost me 400 dollars. e.
The foundation itself occupied 3 rows and was laid not on concrete pillows, but on a pillow of rammed gravel. In addition, on the advice of knowledgeable people, roll-on waterproofing bikrost was laid out under the first row. The next day, at the same concrete goods factory where I bought the blocks, I ordered 2 cubic meters of a solution of brand m 100 (I’ll say right away I had 0.5 cubic meters left and had to be thrown out). Installation of the two remaining rows of blocks is done by professional installers and a crane operator with my help. Managed for 7 hours and took 150 cu for installation and 150 cu for the crane, which I think is not expensive, since I myself would not have put these blocks in such a way.
pros
The result is a roomy semi-basement
Reliable grounds for a two-story brick house.
Minuses
The high cost of material and work
High cost of equipment rental
High labor costs